Power supply
110 kV substations and network: a UZS 175 billion project; design is under way with the Kuwait Fund.
Project cost: UZS 175 billion. Funding source: network company funds (not yet financed).
Stage 1 — UZS 94 billion: installing 2 110 kV cells (UZS 10 billion); building 2 substations of 63 MVA (UZS 70 billion); laying 4.1 km of 110 kV transmission line (UZS 14 billion).
Stage 2 — UZS 81 billion: 2 substations of 40 MVA (UZS 65 billion); laying 5 km of 110 kV transmission line (UZS 16 billion).
The design of internal utility networks, including the power supply project, is being carried out together with the Kuwait Fund for Arab Economic Development: negotiations are under way to attract a USD 1.0 million grant to prepare the project’s economic basis and a USD 165 million loan for the power networks.